SOURCES AND REFERENCES
Every clause we quote comes with its source
Vendor warranty terms, support policies and national standards cited elsewhere on this site are collected here. So you can check them yourself — including checking whether we quoted them correctly.
Every link is a public page on the issuing organisation’s own site. Last verified one by one: 8 September 2026. Standard and document numbers are also given as plain text, so you can still find them if a link breaks.
Manufacturer warranty and support policies
H3C
- H3C Standard Limited Warranty Terms for IT Products (v2.0) (Chinese) Both sentences quoted in question 1 of our FAQ are in this document: installing, removing, reconfiguring or replacing hardware or software without H3C’s permission is grounds for loss of warranty; and a replacement part “may be new or a refurbished unit of equivalent class, function and quality”.
- Maintenance service terms (Chinese) An index page; contract terms for IT products (servers, storage) and CT products (network equipment) are downloaded separately — select the product line on the page.
IBM
- Fix Central — Entitlement “Fix Central Machine Code updates are available only for IBM machines that are under warranty or an IBM hardware maintenance service agreement.”
- Changes to Server Firmware download via HTTP, FTP and HMC States that IBM began entitlement validation for system firmware on Fix Central in January 2014, validating by machine type and serial number.
Oracle
- Frequently Asked Questions About System Firmware “You will be required to have a valid Oracle Support contract or Hardware Warranty before being entitled to obtain access to firmware updates.”
- Oracle Hardware and Systems Support Policies (PDF) Sets out that hardware modified or adapted without Oracle’s written consent, or repaired by a third party in a manner failing to meet Oracle’s quality standards, may fall outside support.
Huawei
- Certified Service Solution Partner (CSSP) (Chinese) The official CSSP programme page; three tiers — certified, preferred, leading.
Lenovo
We hold the PDF of Lenovo’s General Terms and Conditions for Extended Warranty and Technical Services, which states that equipment “installed, repaired or disassembled by service personnel not authorised by Lenovo” is not covered, and that equipment using non-standard expansion components not certified by Lenovo falls outside the service scope.
Its public download address is a temporary object-storage path and is not suitable to cite here long-term. Ask us for the file, or request the current version from Lenovo.
Engineer and service-provider certification schemes
- H3C Certification (Chinese) The official three-tier scheme: H3CNE (engineer) / H3CSE (senior engineer) / H3CIE (expert), across data centre, intelligent storage and computing tracks.
- H3C network service qualification standard (Chinese) Star-rated service qualification (one to five stars), tied to the number of certified engineers held. The standard is reissued annually, so cite it without pinning a year.
Chinese national standards
Directly linkable
- GB/T 44463-2024 — General technical requirements for Internet Data Centres (IDC) Current; issued 29 September 2024, in force 1 April 2025.
- GB 40879-2021 — Maximum allowable values of energy efficiency and energy efficiency grades for data centers Current; in force 1 November 2022.
Given as standard numbers only
We deliberately do not link these two. The issuing sites have been reorganised in recent years and the same document exists at several historical paths, so a link is likely to rot. Search by standard number instead.
- GB 50174-2017 — Code for design of data centers (current version) Clause 3.1.1 classifies data centres as Grade A, B or C: Grade A is a fault-tolerant system, Grade B a redundant system, Grade C meets basic needs. The familiar “Grade A = 2N, Grade B = N+1” is an engineering-level interpretation, not the text of the code.
- GB 50462-2015 — Code for construction and acceptance of data centre infrastructure (current version)
Computing-power and energy-efficiency policy
- NDRC 发改高技〔2022〕66号 — approval of the Guangdong–Hong Kong–Macao national hub (Chinese) Requires data centre PUE at or below 1.25 and average rack occupancy of at least 65%.
- NDRC 发改数据〔2023〕1779号 — implementing opinions on the “East Data, West Computing” programme (Chinese) Targets include hub nodes taking more than 60% of national new computing capacity, and new data centres exceeding 80% green power.
One caution: each of the eight national hubs was approved by its own letter and the PUE limits differ. A blanket claim that “China requires PUE ≤ 1.2” should be checked back to the specific hub and document number.
About this page
Why it exists. With third-party maintenance, the most reasonable doubt a customer has is whether what the supplier says is true. Rather than write more about ourselves, we would rather put the sources on the table — reading them yourself is worth more than hearing it from us.
Three rules we hold ourselves to:
- Quote the text, don’t paraphrase it. If you find a quotation that is inaccurate, tell us and we will correct it.
- If we cannot find an official public source, we do not write it. Real examples: the tier names of Lenovo’s enterprise service-provider scheme, the tier structure of Huawei’s ICT authorised service centres, and the official names of Huawei’s HCIA/HCIP/HCIE tracks. For each of these we found only second-hand accounts from training companies, with no manufacturer source — so not a word about them appears on this site. Better to say less than to guess.
- Links rot. When we find a dead one we update it or convert it to plain text. If you spot one first, we would be glad to hear.